Finished Product Refrigerated Warehouse, BMS

As part of Bristol-Myers Squibb plan of expansion to the refrigerated warehouse storage capacity for finished product, in order to support the projected growth for the next year. This plan consisted of the expansion of the building structure of 11000 SF which included one cold box for shipping preparation to be supplied and install by BMS. The remaining space will used for Docking area ,personnel and material entrance ,office area ,personnel flow, battery charging area and general support. Scope of work included Site works such as earthwork , asphalt demolition, asphalt paving ,chain link installation, sidewalks ,curbs ,concrete swales and miscellaneous concrete structures, landscape, Concrete Works such as foundations, slab over grade, walls, slab over deck, Masonry Works, Structural Steel installation, Architectural works such as gypsum walls and ceilings, acoustical ceilings, steel doors and frames ,special doors , hardware, aluminum and glass, painting and miscellaneous specialties.

Contract Amount: $1,273,610
Completed: January 2017