Phase G New Manufacturing Building Concrete works, CooperVision

Consisted of Phase G, CSA Works at the BP-5 Manufacturing Building. The scope of works included selective demolition, construction of 60,500 SF of F-55 level concrete slab plus a 28,083 SF slab over deck at the mechanical Mezzannine, two new bathrooms, stairs, CMU blockwork and plaster, cement plaster at exposed foundation and concrete walls, miscellaneous steel work, pads and curbs for equipments.

Contract Amount: $1,106,051
Completed: October 2014