PR25 Coating Suite, Abbvie

As part of reorganization production stages Abbvie developed a plan for the use of existing structure for construction of a new coating facility which included at the first floor a coating room, material air lock, in personnel air-lock, out personnel air lock, solution preparation room, Kadimir room and clean corridors. On the second floor a dust collection room and at the roof a mechanical platform. The scope of work included selective demolition, miscellaneous concrete works, masonry works, structural steel works such as blast resistant walls, stainless steel platforms with catwalks and roof equipment platform, Architectural Works such as gypsum walls and ceiling, stainless steel frames and doors, special doors, blast proof doors, hardware, fiberglass cleanable ceiling, PVC wall covering, terrazzo epoxy flooring, painting and the installation insulated translucent wall panels. Also included all mechanical and electrical works for the following systems, chilled water, heating water, steam, steam condensate, potable water, protected water, protected fresh and hot water, compress air & nitrogen, acetone and alcohol and solution and ventilation systems. Also all lighting, alarm, security and fire protection systems.

Contract Amount: $3,089,000
Completed: August 2017