Demolition and replacement of concrete slabs on a fully operational warehouse. As contract required the client’s operation never where impacted, delayed or stopped.
Contract Amount: $1,444,000.00
Completed: June 2008
Green Building considerations:
- Building reuse, the project consists of the renovation of an existing facility.
- Construction waste management techniques were required.
- The metal demolished was recycled.
|